Solar Permitting
SOLAR PERMITTING
AHJ SUBMISSION HANDLING
We deal with the AHJ, so your team can stay on the roof
PremiumCAD identifies the correct Authority Having Jurisdiction for every site, submits the permit application through their portal or process, and tracks it end to end — including corrections — until it's approved.

20,000+
U.S. jurisdictions tracked for requirements & portals
50
States covered for submission & PE stamps
24h
SolarAPP+ & instant-issue jurisdictions
1 team
Single point of contact from submission to approval
SCOPE OF SERVICES
Permit design gets a project ready. Submission handling gets it approved.
A complete plan set still has to go through the right door, in the right format, with the right fee attached. That part of the job is ours.
01
Jurisdiction identification
We confirm the exact AHJ for the site — city, county, or fire district — and the software or process they submit through.
02
Application preparation
Every jurisdiction's own form, completed with project, contractor, and equipment details in the format they expect.
03
Submission
Filed through SolarAPP+, an online portal, or paper/mail-in submission — whichever the AHJ requires.
04
Fee coordination
We calculate and coordinate flat, valuation-based, and plan-check fees so nothing holds up intake.
05
Status tracking
We monitor the application in the AHJ's system and flag movement, so you're not the one checking a portal daily.
06
Corrections & resubmittal
If the reviewer comes back with comments, we revise and resubmit on your behalf until the permit is issued.
NO TWO AHJs ARE ALIKE
Every jurisdiction reviews differently. We already know how yours does.
Requirements, formats, and turnaround swing widely by city and county. We match the submission to the process rather than forcing one workflow everywhere.
INSTANT ISSUE
SolarAPP+ Jurisdictions
Automated review against code checks, issued without a manual plan reviewer.
~24 Hrs
DIGITAL
Online Portal Review
Uploaded through the AHJ's permitting software, reviewed by staff on their queue.
3–7 business days
MANUAL
Paper / Mail-In
Physical or emailed submission to a building department that hasn't digitized intake.
1–3 weeks
ENGINEERING REVIEW
PE-Stamped & Fire Review
Larger commercial systems requiring stamped structural/electrical review and fire department sign-off.
2–3+ weeks
AVOIDING DELAYS
Most delays come from the same handful of issues
We check for these before a submission ever reaches the AHJ's desk, not after it comes back with corrections.
Missing PE calculations
The single most common reason a submission is flagged: no structural stamp where the jurisdiction requires one.
Wrong AHJ selected
Overlapping city, county, and fire-district boundaries send applications to the wrong desk entirely.
Incomplete application form
Every jurisdiction's form is different — a field left blank on one AHJ's form is a rejection on another's.
Equipment mismatch
Datasheets that don't match the equipment named in the plan set trigger a correction request on their own.
Missing signage or labeling
Placards & label placement are checked against the specific jurisdiction's amendments, not a generic template.
Unpaid or miscalculated fees
Flat, valuation-based, or plan-check fees calculated wrong stall an application before review even starts.
WORKFLOW
From site address to permit in hand
1
Confirm the AHJ
We map the address against jurisdiction and fire-district boundaries to identify the correct authority and submission method before anything is filed.
2
Assemble the application package
Plan set, structural/electrical calculations, PE stamp if required, equipment datasheets, and the AHJ's own application form, completed to their format.
3
Submit & pay fees
Filed through SolarAPP+, the AHJ's online portal, or paper/mail-in, with the correct fee type calculated and paid.
4
Track through review
We monitor the application's status and follow up with the reviewing office directly, so you get progress updates instead of silence.
5
Manage corrections
If the reviewer requests changes, we revise the plan set or application and resubmit on your behalf, tracking it through to close-out.
6
Deliver the approved permit
Permit delivered to your inbox, ready for install and inspection scheduling — with as-built support available afterward for PTO.